Scope of Work (Bathroom Remodel)
Full demolition of the existing bathroom
Preparation of subfloor and all surfaces for installation
Installation of a new shower area
Tile installation on floors and walls (including shower)
Installation of in-floor heating system under tile
Installation of bathtub (freestanding or built-in)
Installation of double vanity with two sinks
Plumbing connections and final finishing work
💰 Total Labor: $13,000
Materials are not included and will be billed separately based on receipts